1.
The Three Gorges double-way and five-step shiplock is a massive civil and electromechanical works, dealing with constraining factors such as sophisticated technologies, tight time schedule, etc.
三峡双线五级船闸是一个超大型土建施工和机电安装项目,涉及技术复杂、期紧等制约因素。
2.
Monitoring Analysis of Three Gorges Double-way and Five-step Navigation Lock

三峡双向五级船闸施工和运行监测成果分析
3.
Study on four-step operational mode prototype debugging of TGP lock under impounded level 156 m in the finishing construction period
三峡船闸完建期156m蓄水位4级运行方式原型调试研究
4.
The navigation facilities at the Shulkou project comprise a one-way three-flight ship lock and a oneway 2×500-ton ship lift.
水口水电站航运过坝采用一线三级船闸和一线2×500t垂直升船机。
5.
Research on Freight Demand and Lock Capacity of the Three Gorges;

长江三峡船闸过闸需求与通过能力研究
6.
Study on high excavated rock slope at TGP shiplocks

三峡船闸高陡岩石开挖边坡设计研究
7.
Numerical Simulation of 3-D Hydraulic Characteristics of Inlet for Three Gorges Project Lock
三峡船闸进水口三维水动力特性数值模拟
8.
Monitoring analysis on the seepage at curtain zone in permanent ship lock of TGP

三峡工程永久船闸帷幕区渗流监测分析
9.
Prototype Hydraulic Observation of Three Gorges Shiplock during Joint Trial Operation

三峡船闸系统联合调试期水力学原型观测
10.
MONITORING ANALYSIS ON PRESTRESS STATE OF ANCHOR CABLE OF HIGH SLOPE OF THE TGP PERMANENT SHIPLOCKS
三峡永久船闸高边坡锚索预应力状态监测分析
11.
Design of system Anchor rods for TGP permanent shiplock high slope

三峡工程永久船闸高边坡系统锚杆动态设计
12.
On the lining concrete design age of TGP permanent shiplocks

三峡永久船闸衬砌混凝土设计龄期探讨
13.
Study on Safety Monitoring Data Management System During Construction of TGP Permanent Lock
三峡永久船闸施工期安全监测数据管理系统
14.
The anchorage of the high side-slope of Three Gorges Ship Lock and the development of new non-bonded anchorage cable
三峡船闸高边坡锚固及新型无粘结锚索开发
15.
Study on the Identification and Evluation of the Major Hazard Sources of the Three Gorges Lock;
三峡船闸重大危险源的辨识与评价研究
16.
Excavation Displacement Analysis by Distinct Element Method in Three Gorges Project;

三峡永久船闸高边坡开挖变形的离散元法分析
17.
The Lined Wall Design and Inspects of Three Gorges Permanent Navigation Lock;

三峡永久船闸砼衬砌墙结构设计与监测
18.
Study on Concrete Quality Control in the Floor the Three Structure of Gorges Project s Permanent Ship-locks;
三峡永久船闸地面工程混凝土质量控制与研究