1.
Resolution to Corner Coal Exploitation Scheme of Aged Coal Mine

衰老矿井边角呆滞煤开采方案设计研究
2.
Schematic design of full trackless underground mining of Aigedzor copper-moly ore

艾格佐尔铜钼矿全无轨地下开采方案设计
3.
The Design and Study of Mining Method under the Village for Aiyou Mine 106 Mining Area;

艾友矿106采区村庄下开采方案的设计研究
4.
Discussion on raise design options on -10m~+150m level Carboniferous first mining area in Datai well of Muchengjian Coal Mine
木城涧煤矿大台井-10m~+150m水平石炭纪开采首采区上山设计方案探讨
5.
Design of Mining Method and Mining Practice in One Gold Mine of Songxian

嵩县某金矿采矿方法设计与开采实践
6.
Water quality-Technical regulation on the design of sampling programmes

GB/T12997-1991水质采样方案设计技术规定
7.
And the proposal has been adopted by the design department.

推荐的工程方案已被设计单位采用。
8.
LED Testing System Scheme Design and Signal Acquisition;

LED测试系统方案设计及信号采集
9.
Design of the Procurement Accounting Reengineering in Business Process Reengineering

BPR中的采购核价流程再造方案的设计
10.
High-rise building energy-saving heating system design research

高层建筑节能采暖系统设计方案研究
11.
Research of E-procurement Design in Baosteel Company;

电子化采购及宝钢电子化采购方案设计的研究
12.
(2) having a planned mining area, the limits of mining and a plan for comprehensive utilization of the resources;
(二)有计划开采的矿区范围、开采范围和资源综合利用方案;
13.
Gathering Method Design for PLC Switching Value Based on Group Scan

基于组扫描的PLC开关量采集方法设计
14.
In the paper, the design of dewatering and drainage by pipe well point method for deep foundation pit excavation of a metro station in Shenzhen city is presented.
主要介绍了深圳地铁×车站深基坑开挖所采用的管井井点降水方案的设计情况。
15.
The design scheme for the clamp using Sm_2 Co_17 permanent magnet is introduced.

介绍了采用钐钴永磁铁的夹具设计方案。
16.
The Study of the Technology and Scheme Design of Thermal Production at the Shanjiasi Heavy Oil Field;
单家寺油田稠油热采技术及方案设计研究
17.
Design of High-precision Seismic Acquisition Geometry In Machang Area

马厂地区高精度地震采集观测系统方案设计
18.
Analysis and Comparison of Two Design Schemes on No.12 District in No.2 Mine of Yangquan Coal Group
阳煤二矿十二采区设计方案比较与分析