1.
The Reasons and Solving Measures for the Increased Resistance of the Horizontal Pipe Primary Cooler of the Chemical Products Workshop
化产车间横管初冷器阻力升高的原因及解决措施
2.
EXPANDING CONNECTION TECHNOLOGY FOR HEAT EXCHANGE TUBES IN CROSS-PIPE PRIMARY COOLER

横管式煤气初冷器的换热管胀接工艺研究
3.
Brief Talk on Heating Design of Using Waste Heat of Lateral Pipe Cooler Cooling Water

浅析横管冷却器冷却水余热采暖设计
4.
The operating situation in the cross pipe primary cooling process for COG is described. The feature, effect and existing problems in primary cooling process after modification have been pointed out.
叙述了焦炉煤气横管初冷工艺中的操作情况,指出了改造后初冷工艺的特点、果及存在问题。
5.
heat pipe-radiator cooler

热管-辐射器制冷器
6.
condenser plate

冷凝器管板电容器片
7.
condenser tube anti-corrosion device

冷凝器管抗腐蚀装置
8.
cryogenic line leak detector

制冷剂排管泄漏检测器
9.
air tube cooler

管状空气辐射冷却器
10.
Move the cooler lines back into position.

将冷却器管线移回原位。
11.
centralized piped supply system for condenser cooling

集中式管道供应冷凝器冷却水系统
12.
CAD of Air-Cooled Condenser & Scene Simulation of Capillary Tube;

空冷式冷凝器CAD及毛细管的视景仿真
13.
Preliminary Research on the Performance of an Evaporating Intercooling of Multiple-hole Material;
一种多孔介质蒸发冷却中冷器性能的初步研究
14.
Preliminary study on frozen method of boar sperm in 5mL straws

猪精液5mL大管冷冻方法的初步研究
15.
Remove the upper radiator hose and coolant tank hose.

拆卸上散热器软管和冷却剂箱软管。
16.
Remove the upper radiator hose and coolant recovery hose.

拆卸上散热器软管和冷却剂回收软管。
17.
The co-ncentrator is jacket structure, the condenser is tubular and the cooler is coil-type.
浓缩罐为夹套结构,冷凝器为列管式,冷却器为盘管式。
18.
Water cooled condenser. Coil or plate type can be specified.

水冷式冷凝器。可指定是盘管类型或平板类型。