1.
New Technology in the Cupola(Part Ⅱ) Water Cooling Cupola With Long-term

冲天炉新技术(2):水冷长炉龄冲天炉
2.
New Technology in the Cupola (Part Ⅳ) Natural Gas Cupola

冲天炉新技术(4):天然气冲天炉
3.
New Technology in the Cupola(Part Ⅴ) Dust Remove of Cupola Waste Gas

冲天炉新技术(5):冲天炉的尾气除尘
4.
New Technology in the Cupola(Part Ⅲ):Waste Heat and Hot Blast Cupola

冲天炉新技术(3):炉气余热与热风冲天炉
5.
Hi-Temperature Cupola Gas-Dust Cooling Device and Heat-Recovering Technique

冲天炉高温烟尘冷却装置及余热回用技术
6.
A Building Furnace Method of Extension to Medium-frequency Furnace

一种延长中频感应电炉炉龄的筑炉方法
7.
gas chromatograph for cupola furnace

冲天炉用气相色谱仪
8.
microcomputer controlled weighting device for cupola charge

微机控制冲天炉配料秤
9.
cupola slag hole block

冲天炉出渣口成型砖
10.
Carbon ramming material is used on the spacer,the bottom of blast furnace and some other parts of the blast furnace.
高炉炉底垫层、炉底和炉缸环行碳块与炉壳间的间隙,炉底水冷管以上到炉底钢板。
11.
New Technology in the Cupola(Part Ⅰ):The New Theory of Operation and Coke Bed Control

冲天炉新技术(1):冲天炉操作新理论与底焦控制
12.
Preliminary Water-Cooled Vibration Row Furnace Straw Direct-Fired Boiler Debugging

浅析水冷振动炉排秸秆直燃锅炉调试
13.
Melting Control of 3 t/h Spacious Twin-Tuyeres Cold Blast Cupola

3t/h两排大间距二次送风冷风冲天炉的熔炼控制
14.
Measures for prolonging Service Life of the Soft Water Closed Circuit Circulation Cooling System for BF Cooling Stave
延长高炉冷却壁软水密闭循环冷却系统使用寿命的措施
15.
The cupola-induction furnace duplex melting process can be used to increase the inoculation effect.
采用冲天炉感应炉双联熔炼能提高孕育效果。
16.
Cold bending of 2 200 m~3 blast furnace cooling stave pipe

2 200 m~3高炉冷却壁水管的冷弯
17.
Structure optimization of water cooling channel of cast steel stave

高炉铸钢冷却壁冷却水管的优化研究
18.
The reheating furnace for rolling employs water for cooling furnace door, skied pipes and so on .
加热轧件的加热炉用水来冷却炉门和滑道管等。