1.
					
							The Study and Restructure of the 2000t/d Clinker Grate Cooler;
						
					
					
						
						
					
					
						2000吨/日篦式冷却机研究与改造
					2.
					
							Finite element analysis of cement cooler grate plate based on ANSYS
						
					
					
						
						
					
					
						采用ANSYS的水泥冷却机篦板有限元分析
					3.
					
							Study on Cooling Method and Flow Law for Snake Movement Cooler Clinker
						
					
					
						
						
					
					
						蛇型运动篦冷机熟料冷却方法及流动规律研究
					4.
					
							Reliability Analysis Method for Cement Cooler Grate Plate Based on Monte Carlo
						
					
					
						
						
					
					
						基于蒙特卡洛法的水泥冷却机篦板可靠性分析
					5.
					
							CBR-based Intelligently Optimized Index Setting for Clinker Cooling Process with Grate Cooler
						
						
						基于案例推理的篦冷机熟料冷却过程智能优化控制
					6.
					
							Research on Predictive Control in Grate Cooling Process of Cement Clinker;
						
					
					
						
						
					
					
						预测控制理论在水泥熟料篦式冷却过程中的应用研究
					7.
					
							Technique Reformation about Fuller 609s-819s/809s-1019s Machine Cement Coolin;
						
					
					
						
						
					
					
						Fuller 609s-819s/809s-1019s篦冷机技术改造
					8.
					
							induced draft mechanical cooling tower
						
					
					
						
						
					
					
						抽风式机械通风冷却塔
					9.
					
							forced draft mechanical cooling tower
						
					
					
						
						
					
					
						鼓风式机械通风冷却塔
					10.
					
							vapor-cycle-cooled engine
						
					
					
						
						
					
					
						蒸汽循环冷却式发动机
					11.
					
							closed circuit cooler for electric machine
						
					
					
						
						
					
					
						电机用闭式循环冷却器
					12.
					
							dry type air cooler
						
					
					
						
						
					
					
						干式空气冷却器干式冷风机
					13.
					
							The clinker discharged from grate cooler will be transported by chain conveyor to the top of clinker silo.
						
						
						从篦冷机卸出的熟料,链斗机送往熟料库顶。
					14.
					
							The cooling water system of Main, auxiliary engine are all closed-type cooling, their cooling water piping are arranged separately.
						
						
						主、柴油机的冷却水系统均为闭式冷却,其冷却水管分别设置。
					15.
					
							Research on Gas-Solid Heat Exchange Model of Clinker Grate cooler in Stable Field Condition
						
						
						稳定工况下篦冷机气固两相热交换模型研究
					16.
					
							Comparison of Unit Energy Consumption for Clinker Transporting between Two Typic 4th Generation Cooler
						
						
						两种典型四代篦冷机的熟料推动单元功耗比较
					17.
					
							The new-fashioned control trchnology of cold burden layer thickness for cement production line
						
						
						水泥生产线篦冷机料层厚度新型控制技术
					18.
					
							indirect cooling air cooler
						
					
					
						
						
					
					
						间接冷却式空气冷却器