1.
Improved Design of Carrying Project Control Method at Changqing Water and Power Supply Department;
长庆水电厂工程施工质量控制方案改进设计
2.
Toughened Cement Slurry for Repairing Casing Damage in Oil Wells of the Third Changqing Production Factory
增韧水泥浆用于修补长庆油田采油三厂套损井
3.
Application and Research of the Whole-Course Feed Water Control System for 200MW Unit in Chongqing Power Plant;
重庆发电厂200MW机组给水全程控制系统的应用研究
4.
Cause Analysis and Prevention of High Temperature Corrosion of 22# Boiler in Chongqing Power Plant
重庆发电厂22#锅炉水冷壁高温腐蚀原因分析及对策
5.
Remolding personalized living space of sidewalks of Chongqing;

重庆城市步道人性化生活空间的重塑——重庆市渝中区水厂至长江滨江公园步道环境设计
6.
hydroelectric(power) statio

水(力发)电厂[站]
7.
Experiment Study on Hgdranlic Fill Dam for Fly Ash Storefield of Changchun Thermal Power Plant
长春热电厂储灰场水力冲填坝试验研究
8.
Study on the Growth Regularity and Control of Microorganism of the Cooling Water in Power Plant;
电厂冷却水微生物生长规律及控制措施研究
9.
Operation Analysis of High Voltage Asynchronous Motors in Chongqing Power Plant

重庆发电厂高压异步电动机运行分析
10.
Decision Support System of Long-Term Optimal Scheduling for Muti-hydropower Stations in ChongQing Power System;
重庆电网水电站群中长期优化调度决策支持系统研究
11.
Activity-Based Cost Management Apply in Changqing Oil Production Plant NO.2

长庆油田采油二厂作业成本管理研究
12.
Discussed Shallowly about Sewage Treatment Present Situation in Yinjin Branch Factory

重庆天然气净化总厂引进分厂污水处理现状
13.
Investigation on Reclaimed Water Reuse

大庆石化公司化工三厂中水回用探讨
14.
The Alter on Main Business Process in ChongQing Saite Electronical Machine Factory;

重庆赛特电机厂主业务流程改造研究
15.
Research on the Effect of Thermal Discharge from Changshan Heating and Power Plant to Aquatic Organisms in Kuli Pool;
长山热电厂温排水对库里泡水生生物影响的研究
16.
Research and Application of Stator Bar with Elongation of 360°Transposition in Xinanjiang Hydropower station Hydrogenerators
新安江水力发电厂发电机定子线棒延长360°换位方式的研制和应用
17.
Application of Highly Reliable Electric Secondary System Construction Scheme to Changzhou Hydropower Plant
高可靠性电力二次系统建设方案在长洲水电厂的应用
18.
Analysis on Operation Mode of Station Service System on Outer River of Power Station of Changzhou Hydraulic Complex under Special Conditions
长洲水利枢纽电站外江厂用电特殊情况下的运行方式分析