1.
Global Analysis of Static and Seismic Response for the Concrete Gravity Dam and Factory Building at Dam Toe;
混凝土重力坝及坝后式厂房整体静动力分析
2.
Study on Dynamic Characteristics and Monitoring of Large-size Power-house of Power Station at Dam Toe;
大型坝后式电站厂房动力特性及动力监测研究
3.
Study on the Dynamic Characteristics of Supporting Composite Construction for Power Station at Dam Toe;
坝后式水电站厂房机墩组合结构动力特性研究
4.
Dynamic Behavior and Earthquake Response of the Dam Section with Inserted Power Station of Fengshuba Dam
枫树坝坝内式厂房段的动力特性和地震反应
5.
Study on Water Seal Layout at the Power House Monolith Joint of Power Station in River Channel;
河床式水电站厂房坝段横缝止水布置形式研究
6.
Finite Element Analysis of the Earthquake Resistance for the Riverbed-Hydropower Station

河床式水电站厂房坝段三维有限元抗震分析
7.
Dynamic Character Research and Earthquake Resistance Anlysis of the Plant Monolith in River Channel;
河床式水电站厂房坝段动力特性研究及抗震分析
8.
An analysis of aseismic dynamic characteristic of workshop section in the Yangtse Gorges dam
三峡大坝厂房坝段结构抗震动力特性分析
9.
Study on Stability of Dam Body and Foundation on the Powerhouse in the Feilai Gorge Project;
飞来峡厂房坝段坝体及基岩稳定性研究
10.
Research on contact of powerhouse′s longitudinal joint of TGP

三峡工程厂房坝段纵缝接触问题研究
11.
This paper carries on the3 D finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of Huang River as the carrier.
以黄河上游拟建的某灯泡贯流式水电站为载体,对厂房坝段整体进行了三维有限元结构分析。
12.
The strengthening design of light-weight steel industrial buildings with portal frame after snowstorm
暴雪后门式刚架轻型房屋钢结构厂房的加固设计
13.
ANALYSIS AND TREATMENT OF ACCIDENT IN MILL BUILDINGS OF LIGHT-WEIGHT STEEL STRUCTURE WITH PORTAL FRAME AFTER SNOWSTORM
暴雪后门式刚架轻型房屋钢结构厂房的事故分析与处理
14.
According to presentations, the second phase project of the Three Gorges Project mainly includes bids such as the flood discharge dam, the factory protection dam and the factory buildings, etc.
据介绍,三峡工程二期工程主要包括泄洪大坝、厂房大坝及厂房等标段。
15.
Mathematical Model for Dam Safety Monitoring and Dynamic Inverse Model for Power House

大坝安全监测及厂房动力反演分析模型研究
16.
Study on the Seepage Control Schemes of the Dagang Mountain High Arch Dam and Underground Powerhouse;
大岗山高拱坝及地下厂房渗流控制方案研究
17.
Surrounding Rock Stability Analysis and Support Design Study for Xiangjiaba Underground Powerhouse;
向家坝地下厂房围岩稳定分析和支护设计研究
18.
Three-dimensional Seepage Analysis of Powerhouse Dam Section of Xixia Institute Anti-regulation Reservoir
西霞院水库电站厂房坝段三维渗流计算分析