说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 集成工程进度计划与原材料订货
1.
Research on the Simulation of Integrated Project Scheduling and Material Ordering Problems;
集成工程进度计划与原材料订货仿真研究
2.
Waterproofing design criteria of underground works and combined effects of rigid and flexible materials
地下工程防水设计原则与刚柔材料的集成效应
3.
Research and Implementation of Integrated System for Nesting and Material Quota Management
企业信息化进程中原材料定额管理系统的集成研究与实现
4.
Plan and Control of Schedule in Telecommunication Design Project
通信工程设计项目的进度计划与控制
5.
On the Process Plan and Management Research of the Transformation of Old Cities of Central Heating Projects in Songhe Park Community
松鹤园社区旧城改造集中供暖工程进度计划与控制研究
6.
essential tools and materials; funds essential to the completion of the project; an indispensable worker.
基本的工具和原材料;完成计划的基本资金;一个不可或缺的工人。
7.
The Research of the Schdule Plan and Controlling about the Heat-power Project in the United Laboratory Corporation;
联邦制药(成都)有限公司热电联产工程项目进度计划与控制研究
8.
Teaching Reform and Practice of Specialty Course Design of Material Shaping and Control Engineering
材料成型及控制工程专业课程设计改革与实践
9.
Application and Calculation of Geosythetics in Widening of Old Road;
土工合成材料在旧路加宽工程中的应用与计算
10.
The Research of Project Cost & Time Integrated Management Program;
建设项目造价与进度集成管理计划研究
11.
Integrated production planning and scheduling based on workflow technology;
基于工作流技术的集成化生产计划与调度模型
12.
Differences between schedule progress and actual progress in construction of railway projects;
谈铁路工程的设计计划进度与实际施工进度的差异
13.
Integrated system of work order planning and execution in shop floor under supply chain
供应链环境下车间订单计划与执行的集成系统
14.
Research of Schedule Plan and Schedule Control of Fire System of Jingshui Building;
晶水大厦消防工程项目进度计划与控制研究
15.
Schedule Plan and Schedule Control of JD Smart Card Applying System;
JD校园一卡通工程(一期)项目进度计划与控制
16.
Research of Schedule Plan and Schedule Control of Maintaining Project of Qintglonchang Flyover;
青龙场立交桥维修工程项目进度计划与控制
17.
Moreover, in order to shorten the service time to our clients, we have established a centralized order center to integrate ordering windows from each business division and further improve customer satisfaction.
另外,为缩短服务客户的流程成立集中订货中心,整合各事业部订货窗口,提高客户满意度。
18.
Be responsible for products‘ quality control and management include the raw material stock inspection, process check, and final product check.
负责产品全过程质量控制与管理包括原材料进货检验、程检验、终产品检验。