说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 可预见规则
1.
The Study of the Rule of Predictability in Chinese Contract Law;
我国违约责任中的可预见规则之研究
2.
The Application of the Rule of Foresight in International Project Contracts;
可预见规则在国际工程承包合同中的适用
3.
Doctrine of foresight means of limitation of compensation for damages in breach abstract;
作为违约损害赔偿范围限制方式的可预见规则
4.
My Views on the "Pedictable" as a Restriction Rule in Against-contract Compensations;
关于违约赔偿的“可预见性”限制规则之我见
5.
The Exploration of the Applicable Scope of the Rule of Foresight in Contract Law in China;
我国合同法可预见性规则适用范围探讨
6.
When we see in advance dangers ahead of us, we'll make preparations to avoid them.
预见其患则可及早防范。
7.
Research on Application of Reasonably Foreseeable Rule of Damages for Breach of Contract
违约责任中的合理预见规则适应研究
8.
Rules of origin should be objective, understandable and predictable;
原产地规则应是客观的、可理解的和可预测的;
9.
(c) rules of origin should be objective, understandable and predictable;
(c)原产地规则应是客观的、可理解的和可预测的;
10.
How to Apply the Foreseeable Principle in Determining the Range of Compensation for Damage of Default;
确定违约损害赔偿范围如何适用可预见原则
11.
Dense irregular c. t., with fibers running in all directions.
不规则致密结缔组织,可见纤维不同走行方向。
12.
Big, irregular nucleus with multiple nucleoli could be seen in the cytoplasm by transmission electron microscopy.
电镜下周细胞核大、不规则、有切迹,可见多个核仁。
13.
The Theory of Duty to Reveal Information in Anglo-American Contract Law--On the Rule of Reasonable Foreseeability
英美合同法中的信息揭示义务理论研究——兼谈合理预见规则
14.
Without regular time relationship;unexpected or unpredictable with respect to the execution of a program's instructions.
没有规则的时间关系,对程序指令的执行是无法预料或不可预测的。
15.
What seem out of the question for the foreseeable future are the medium-scale “wars of choice”.
在可预见的将来似乎不可能的,是中等规模的“选择的战争”。
16.
operations that occur without a regular or predictable time relation to other events.
不依照一个规则的或可预测的时间关系而发生的操作。
17.
For the first time, we'ye taken the principles of industrial design -- quality control, predictability and applied them to a human being."
第一次,我们把工业规划原则——质量控制、可预测性——运用于人类身上。”
18.
Computational Experimental Finance,Technical Rules and Time Series Returns Predictability;
计算实验金融、技术规则与时间序列收益可预测性