1.
Construction Control of Long-span Cable-stayed Bridge and Method of Tower and Beam Synchronous Construction
大跨度斜拉桥施工控制和塔梁同步施工方法
2.
Inter-influences of synchronized excavation of closely constructed large-scale deep foundation pits
相邻深大基坑同步施工的相互影响研究
3.
Integral and Synchronous Construction Technology for Urban Rail Transit Station and Underground Space
轨道交通车站与地下空间一体化同步施工技术
4.
Discussion on Amount of Gravel and Asphalt in Synchronous Chip Sealing

同步封层施工中碎石与沥青用量探讨
5.
Code for construction of SDH project of railway optical fiber cable communication

铁路光缆通信同步数字系列工程施工规范
6.
The Synchro Project Cost Control Method Being under Construction Studies;

中建八局施工项目同步成本控制方法研究
7.
Study on the Simultaneous Lining Technology in the Long Tunnel Bored by Main Beam TBM

长大隧道敞开式掘进机施工中的同步衬砌研究
8.
Application of Simultaneous Lining Technology in Zhongtianshan Tunnel Bored by TBM

中天山隧道TBM法掘进同步衬砌施工技术
9.
Study of Material Performance and Material Ratio Design in Synchronized Grouting Technology for Shield Tunneling on Watery Strata
富水地层盾构施工同步注浆材料性能及配合比设计研究
10.
ANALYSIS AND CONTROL ON RISK FACTORS IN SIMULTANEOUS GROUTING DURING SUBWAY TUNNEL SHIELD CONSTRUCTION
地铁隧道盾构施工同步注浆风险因素分析与控制
11.
The model experiment and research of synchronized pouring when in the shield tunneling construction in gravel stratum
砂砾地层中盾构施工壁后同步注浆的模型实验与研究
12.
Key Technology for Erection of 1000kV Transmission Line by Parallel Synchronous Traction of 8-Bundled Conductors Divided Into Two Groups
特高压11标段8分裂导线并行分组同步牵引架线施工关键技术
13.
Research on influence of constructing superstructure layer by layer for the interaction of upper and lower parts of high building
上部结构分步施工对高层建筑上下部共同作用计算的影响研究
14.
The Importance of Double-liquid Grouting Resynchronization in Shield Tunneling Construction
二次同步注双液浆技术在盾构法隧道施工中的应用
15.
Comprehensive Construction Technology for Hydraulic Synchronizing Lifting and Overhead Sliding of Large Steel Structure
大型钢结构液压同步提升及高空滑移综合施工技术
16.
The project will proceed step by step.

该工程将分步实施。
17.
Public sports facilities in residential areas shall be constructed along with major development projects and be made ready at the same time.
居住区公共体育设施工程与居住区主体工程要同步规划建设、同期交付使用。
18.
Only when I choose Synchronize from the Tools menu

仅在执行“工具”菜单的“同步”命令时同步