1.
shaft-sinking [caisson works]
打/挖竖井〔沉箱工程〕
2.
The excavation speed of pilot shaft is one of the key difficulties for the excavation of shaft, high ones in special, of hydropower works.
水电工程竖井特别是高竖井开挖,主要难点体现在竖井导井开挖的速度上。
3.
Summarization on large diameter vertical shaft back well method excavation construction technology
关于大直径竖井反井法开挖施工技术概述
4.
Vibration Measurement and Analysis on Control Blasting Technology for Shaft Excavation of the Reservoir Dam Area
水库坝区竖井开挖爆破技术及振动测试分析
5.
Application of Shallow Mining Method in Vertical Well Supporting of Shougang Moving Engineering
浅埋暗挖法在首钢搬迁工程竖井支护中的应用
6.
The shaft of a mine.
竖坑矿的矿井或竖井
7.
multi-level outlet shaft spillway
多层进水竖井式溢洪道
8.
Tsiu Keng Shaft Raw Water Irrigation Pump House
蕉径竖井原水灌溉泵房
9.
Cheung Sha Shaft Raw Water Pumping Statio
长沙竖井原水抽水站
10.
Eleven, twelve -dig a well.
十一,十二-挖井。
11.
Study on Vertical Structural Stability of a Super-deep Drilled Shaft in Slurry
泥浆中超深钻井井壁竖向稳定性分析
12.
Lining Slipform Construction Technology of Sending and Exhausting Single-shaft
单井送排风式竖井衬砌滑模施工技术
13.
Flooding of three vertical shafts trapped the miners as they changed shifts.
三个竖井发生透水,把正在换班的工人困在井下。
14.
The 3# Ventilation Shaft back well method Construction Technology of Qinling Zhongnanshan Highway Tunnel
秦岭终南山公路隧道3#竖井反井法施工技术
15.
Shaft Liner Design of Development Shaft for Phase Ⅲ Project in Lancang Lead Mine
云南澜沧铅矿三期开拓竖井井筒的支护设计
16.
Frozen method applied in excavation of vertical shaft of iron ore mine
冻结法凿井技术在铁矿山竖井中的应用
17.
Research on the preliminary thickness design of shaft lining in porous rock aquifer
孔隙型含水基岩段竖井井壁厚度拟订设计研究
18.
Anti-well construction technique of 3# shaft of Zhongnanshan road tunnel in Qinling
秦岭终南山公路隧道3号竖井反井法施工技术