1.
alternatebay construction

(混凝土用的) 隔仓施工法
2.
Study on Concreting Sequence Methods about RCC Gravity Dam Construction

碾压混凝土坝施工分仓跳仓方法研究
3.
Sequence Methods Construction Technology for High-supported Formwork, Large Span,Super Large Section Floor Slab
高支模、大跨度、超大面积楼板“跳仓法”施工技术
4.
The anti-crack technology study on sequence method in super long underground concrete structure
超长地下混凝土结构跳仓法施工抗裂技术研究
5.
Slipform Construction of Large Diameter Raw-coal Buffer Silo Wall

大直径原煤缓冲仓仓壁滑模施工技术
6.
Alternative Bay Method Construction Technology for Mass Concrete of Basement Foundation Slab
某工程地下室底板大体积混凝土跳仓法施工技术
7.
Application and Stored in the Warehouse,Circulation Fumigation Application of Comparative Test;
仓内施药与仓外施药环流熏蒸法对比试验
8.
Fast and Efficient Construction of Bunker No.2 in the Central Mining Area in Donghuantuo Mining Company
浅谈东欢坨矿业分公司中央采区2号煤仓快速优质施工方法
9.
Construction Technology for the Loess Large-section Dual-line Railway Tunnel with Median Septum Excavation
中隔壁法开挖修建黄土大断面双线铁路隧道施工工艺
10.
Research and Application of Thermal Insulation and Sealing Technologies for Grain Bins

粮食仓房的保温隔热、气密性技术措施研究及应用
11.
Research and Develop of Multifunctional Machine for RCC Construction;

碾压混凝土仓面施工的多功能机研制
12.
The Treatment to Construction Defects of a Coal Bunker

某煤仓施工缺陷及质量问题处理方案
13.
Probation of Concrete Silo Reinforcement Bars Design and Construction

钢筋混凝土筒仓配筋设计与施工探讨
14.
Deep foundation pit support design and construction of the desulfurizing warehouse in the power plant
某电厂除硫仓深基坑支护设计与施工
15.
Surface Processing Treatment and Aberration Control over Slip-Form Construction of Large Silo Wall
大型筒仓仓壁滑模施工表面工艺处理及色差控制
16.
CONSTRUCTION INSTALLATION AND ADJUSTMENT OF CHORD ARROW TRAVERSE FOR GEHEYAN HYDROPOWER PROJECT
隔河岩工程弦矢导线施工及安装调试
17.
Tweaked recycle timers on spells; most spells no longer have any recycle time.

修改了施法间隔时间;大部分魔法不再有任何施法间隔了。
18.
a large unpartitioned space over a factory or warehouse or other commercial space.