1.
Improvement of tube welding for settlement prevention hat of tube applied in underwater concrete of bored piles
钻孔桩水下混凝土导管焊接防沉降沿帽的改进
2.
tremie concrete

用导管法灌注的水下混凝土
3.
Finally, the concrete is placed around the reinforcement by termite and the "slurry"is displaced as the concrete rises to fill the trench.
通过导管在钢筋笼周围浇筑混凝土。混凝土不断升高,"泥浆"排出。
4.
Concrete and reinforced concrete drainage and sewer pipes

GB/T11836-1989混凝土和钢筋混凝土排水管
5.
hard missile base

混凝土掩体导弹基地
6.
centrifugally cast pipe

离心浇灌钢筋混凝土管
7.
pipe concrete coating thickness

管子混凝土加重层厚度
8.
Cracks Control Technology for Concrete Tube Sections of Immersed Tunnels

大型沉管隧道混凝土管段混凝土裂缝控制技术
9.
Interaction of steel pipe and concrete in concrete-filled steel tube arch bridge

钢管混凝土拱桥中钢管与混凝土相互作用问题
10.
Test methods of concrete and reinforced concrete drainage and sewer pipes

GB/T16752-1997混凝土和钢筋混凝土排水管试验方法
11.
Test methods of the concrete compressive strength of concrete pipes for water

GB/T11837-1989混凝土管用混凝土抗压强度试验方法
12.
The Study on Joint Performance of Steel-Concrete Composite Beam to CFT Column

钢混凝土组合梁—钢管混凝土柱的节点性能研究
13.
Study on Material Damping of Reinforced Concrete and Concrete-Filled Steel Tube;

钢筋混凝土及钢管混凝土材料阻尼研究
14.
Mechanism Study on Concrete-filled Steel Tubular Column to Steel Reinforced Concrete Beam Joints;
钢管混凝土柱—型钢混凝土梁节点机理研究
15.
Stability Research of Concrete-filled-steel Tube Arch Bridge on Filling Concrete for Arch Rib
钢管混凝土拱桥拱肋混凝土灌注施工稳定研究
16.
Research on the Concrete Quality Control of Concrete-filled Steel Tubular Structure

浅谈钢管混凝土柱柱芯混凝土质量检测
17.
Construction Control of Concrete Lifting for Steel-pipe Concrete Bowstring Arched Bridge

钢管混凝土系杆拱桥混凝土顶升的施工控制
18.
Research on outer annular-stiffener of SRC beam to CFST column connections

型钢混凝土梁与钢管混凝土柱节点加强环研究