1.
sand-packed tube displacement
砂粒填充管驱替试验
2.
Test Research of Raising Coarse Filling Tailings with New HHZ-cyclone
HHZ新型旋流器提高粗颗粒充填尾砂产率的试验研究
3.
EXPERIMENT ON HIGH-WATER QUICK CONSOLIDATED FILLING WITH SINGLE PIPING UNCLASSIFIED TAILINGS IN FENGHUANGSHAN COPPER MINE
单管输送全尾砂高水速凝胶结充填在凤凰山铜矿的试验
4.
Experimental Study on the Displacement and Residual of Dense Non-aqueous Phase Liquid in Sandy Loam
重非水相流体在砂壤中驱替与残留试验研究
5.
median pack-to-formaton grainsize ratio
充填砾石与地层砂粒度中值比
6.
pack-to-formation median grain size ratio
充填物与地层砂粒度中值比
7.
Experimental Research on the Preparation of Whole-tailings Paste Backfilling Material with Red Mud,Slag and Minor Clinker Aggregate
赤泥-矿渣少熟料体系制备全尾砂胶结充填料试验研究
8.
Prediction and experiment for α wave equilibrium sand bed height in horizontal well gravel-packing based on equilibrium velocity
基于平衡流速的水平井砾石充填α波砂床平衡高度预测与试验
9.
TEST AND RESEARCH ON PORE-FORMING TECHNIQUES ON DUCTULE LARGE PARTICLE SANDY COBBLE STRATUM
大粒径砂卵石地层小导管成孔技术试验研究
10.
The Research of Sand Control Technology by Expandable Pre-graved Screen;
可膨胀预充填防砂筛管及防砂机理研究
11.
Study on the influential factors of the productivity prediction in Gravel-Pack perforate wells
筛管砾石充填防砂方式产能影响规律
12.
Experimental Research on Filling the XIGANXIAN Pipe with Cement-Soil Slurry;
西干线老管泥浆充填处置的室内试验研究
13.
Local Test Study of Vibroflotation on Hydraulic Backfilled Silty and Fine Sand without Additional Backfill Materials
无填料振冲法加固吹填粉细砂现场试验研究
14.
Research of wind-quenched granulated slag grit as a substitute of sand in concrete;
风淬钢渣砂在混凝土中替代黄砂的试验研究
15.
This paper introduced the experiment of filling mined bed with unsized tailing and consolidating it with polyhydrite materials which is firstly conducted in China by Lingshan Gold Mine.
文章介绍了灵山金矿在国内首例采用全尾砂实现高水固结充填试验。
16.
Experimental research on mechanical behavior of RHS trusses with concrete-filled in chord
主管内填充混凝土矩形钢管桁架受力性能试验研究
17.
An Attempt on the Application of the Mathematical Statistics in Coal Mining Industry The determination of the capacity of sand bin in hydraulic filling at the Sin Wen Mine)
数理统计在煤炭工业应用的尝试——(新汶水砂充填砂仓容量的确定)
18.
Filling Curved Canal Using Continuous Wave of Condensation Technique in Vitro
连续波充填技术充填弯曲根管的实验研究