1.
recosting of programme budget implications and revised estimates
重计所涉方案预算和订正概算的费用
2.
revised approved estimates of income
订正原核定收入概算
3.
revised estimates of expenditure and income
订正支出概算与收入概算
4.
revised programme budget proposals for the following financial period
下一财政期间的订正方案概算
5.
modified assessment scale formula
计算会费分摊比额的订正公式
6.
additional recosting at revised rates
按订正费率重新计算费用
7.
The measurement of the earth and stone works in the budget estimate of municipal engineering
市政工程概预算中的土石方正确计量
8.
A Study on the Algorithms for Making Attenuation Correction to Observations of Weather Radar Reflectivity Factor and Their Applications;
天气雷达回波衰减订正算法的研究及其应用
9.
This probability will correct for the under or over conservatism of the true probability by the calculated reliability index.
这种破坏概率将校正高估或低估了的计算破坏概率。
10.
The Similar-Consistency of the Judgment Matrix in Uncertain AHP and the Modified IEM Arithmetic;
不确定型AHP的准一致性概念及修正特征根算法
11.
Ways to Increase Correctness in Rough Estimate of Unit Project of Automatic-control Instrument;
提高自控仪表单位工程概算正确性的途径
12.
Probability estimation of smoke layer parameters by the orthogonal test based response surface method
基于正交试验响应面法的烟气层概率分布计算
13.
Probability Simulation Optimization Method Based on Orthogonal Genetic Algorithm
基于正交遗传算法的概率仿真优化方法
14.
Relative cost definition and calculation in economic order quantity model;
关于经济订购量模型中有关成本的正确定界与计算
15.
Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices.
尔后,当他开始动工时,必须对概算进行修改或校正。他的概算基于现行价格。
16.
The Application of Polynomial Approximation Method in Reliability Analysis;
正交多项式拟合概率密度函数在可靠度计算中的应用
17.
Research of Improved Probability Data Association Algorithm for Multi-target Tracking
一种基于多目标跟踪的修正概率数据关联算法研究
18.
An adaptive tracking algorithm based on truncated normal probability density model for maneuverable targets
基于截断正态概率密度模型的机动目标自适应跟踪算法