说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大型高墩渡槽
1.
Structural Dynamic Analysis & Vibration Isolation Analysis Based on ODE Solver for Large-sized Aqueduct with High Pier
基于ODE求解器的大型高墩渡槽结构动力与隔震分析
2.
Study on Seismic Damage Analysis and Risk Evaluation of Aqueduct Piers
渡槽槽墩的地震损伤分析与风险评价
3.
Research on higher-order resonance characteristics of duct-water coupled components in rectangular aqueduct bridge
矩型渡槽槽-水耦合体高阶共振特性研究
4.
Method and Application of Aseismic Analysis for Large-Scale Aqueduct;
大型渡槽结构抗震分析方法及其应用
5.
Fluid-Structure Dynamic Coupling s Analysis of Large Scale Aqueduct;
大型渡槽流体与固体的动力耦合分析
6.
The Study of Huge Hollow Aqueducts Thermal Stress in Running Phase;
特大型空心渡槽运行期温度应力研究
7.
DESIGN AND CONSTRUCTION OF A LARGE IRRIGATION AQUEDUCT BRIDGE′S BLASTING DEMOLITION
一大型水利渡槽爆破拆除设计与施工
8.
The research of sealing materials and sealing structure of expansion joint in the large scale aqueduct
大型渡槽伸缩缝止水材料与结构研究
9.
Pier Structural Shape Research of the High-pier and Long-span Continuous Rigid Frame Bridges
高墩大跨径连续刚构桥桥墩结构型式研究
10.
The FEM Analysis and Monitoring Model Study of the Large Pre-stressed Aqueduct;
大型预应力渡槽的有限元分析及监测模型研究
11.
Study and Application on FEM Analysis of Large-Scale Prstressed Concrete Aqueduct Body;
大型预应力混凝土渡槽槽身有限元分析的研究及应用
12.
Pre-stressed Aqueduct Structure Design about South-to-North Water Transfer Engineering;
南水北调中线工程大型渡槽三向预应力槽身结构设计
13.
Dynamic Analysis for Prestressed Aqueduct with Fluid-structure Coupling;
大型预应力渡槽考虑流固耦合的动力特性分析
14.
Test Research on Dynamic Characteristics of Vibration Isolation System for Large-scale Aqueduct
大型渡槽隔震体系结构动力特性的试验研究
15.
Application Research of Pipe Cooling Technique to Prevent Crack in Large-scale Aqueduct
水管冷却技术在大型渡槽防裂中的应用研究
16.
Simulation methods of prestress in numerical analysis of large aqueduct
大型渡槽数值分析中预应力的模拟方法
17.
Analysis of two-time prestressing construction of aqueduct with large wall-beams
大型墙梁式渡槽二次预应力施工过程分析研究
18.
Research on the Measures of Thermostatic Control to Prevent cracking on the Large Scale Prestress Aqueduct During Construction Period
大型预应力渡槽施工期温控防裂措施研究