说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工阶段索力
1.
Optimization of Cable Tension during the Construction for Cable-stayed Bridges;
斜拉桥施工阶段索力确定的优化方法
2.
Reasonable Cable Tension in Finished State of Cable-Stayed Bridges and the Control during Construction;
斜拉桥的合理成桥索力和施工阶段索力控制
3.
Cable Force Optimization of Cable-stayed Bridge Casting in Place on All Supported Framework and Definition of Construction Stage Cable Force
支架现浇斜拉桥索力优化及施工阶段索力确定
4.
Research on Cable Force Optimum in Construction of Nanyanghu Cable-stayed Bridge
南阳湖斜拉桥成桥及施工阶段索力优化的研究
5.
Mechanical behavior of steel truss bridge stiffened with rigid cables in construction stage
刚性悬索加劲钢桁梁桥施工阶段力学性能(英文)
6.
The Research on the Mechanical Performance of Orthotropic Steel Bridge Decks for the Large Span Suspension Bridge in Construction and Completed Bridge Stages
大跨悬索桥正交异性钢桥面板施工与成桥阶段受力性能研究
7.
Supervision of Investment and Claim in the Stage of Construction of a Project;
监理在工程项目施工阶段的投资控制和索赔
8.
Load Reaction Analysis of the Girder of YongAn Bridge During Construction Procedure;
抚顺永安桥施工阶段主梁的受力分析
9.
Simulation Analysis on the Construction of Concrete Cable-Stayed Bridge with Single Tower and Single Cable Span;
独塔单索面混凝土斜拉桥施工阶段仿真分析
10.
Self-anchored Suspension Bridges Key Construction Phases Analysis and Investigation;
自锚式悬索桥关键施工阶段分析与研究
11.
Construction Control of Long Span Suspension Bridges During Erecting Stiffening Girders
大跨悬索桥加劲梁吊装阶段的施工控制
12.
Methodology for Cost and Schedule Control of Electric Power Construction Project;
电力工程项目施工阶段进度费用联合控制研究
13.
Risk Analysis and Management During the Bidding Phase of Electric Power Projects;
电力工程施工招投标阶段的风险分析和管理
14.
Study on Mechanical Behavior and Cable Force of Segment Construction External Prestressing Bridge;
节段施工体外预应力桥梁力学性能及索力分析
15.
Mechanical Performance of SRC Beam in Construction Phase and Its Construction Technology;
型钢混凝土梁构件施工阶段的受力性能及其施工工艺
16.
Study on Structural Behavior of Steel-concrete Composite Beam Bridge in Constructing Phase;
钢—混凝土结合梁桥施工阶段受力性能研究
17.
Grading Executive Stress Analysis of Frame-supported Frame Structure;
梁式转换层结构考虑施工阶段的受力分析
18.
Static Nonlinear Analysis of Long-Span Cable-Stayed Bridges in Construction Stage;
大跨度斜拉桥施工阶段几何非线性静力分析