说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 坝型选择
1.
Selection of Dam Type and Damsite for Dayakou Hydropower Station on Nanpeng River in Zhengkang County
镇康县南捧河大丫口水电站坝址坝型选择探讨
2.
Application of Multi-layer Fuzzy Synthesize Evalution Method for Dam Type Selection
应用多层模糊综合评判方法选择坝型
3.
The paper introduces the project general arrangement, the selection of dam boy shape, the stress analysis, the stability against sliding of dam abutment and the foundation treatment.
文章介绍了工程总体布置、大坝体型选择、应力分析、坝肩抗滑稳定和基础处理。
4.
Foundation Rock Selection of Gravity Dam Based on Dam Foundaiton Rock Mass Structure;
基于坝基岩体结构的重力坝建基面选择
5.
Optimization of Rubber Dam's Styles Based on Fuzzy Consistent Matrix
基于模糊一致矩阵的橡胶坝坝型优选方法
6.
It also includes a consideration of possible alternatives, such as a concrete gravity dam or an earth-fill embankment dam.
还要考虑到可能的备选方案,比如是选择混凝土重力坝还是选择填土筑堤大坝。
7.
The Independent Variablas-snooping in the Regression Analysis of Dam Deformation
大坝变形监测数据回归分析中的因子选择
8.
Studies on the geologic problems during choicing the dam site of Wulahada reservoir
乌拉哈达水库坝址选择的地质问题研究
9.
Selection of key technical indexes for concrete cut-off wall for foundation of rock-earth fill dam
土石坝基础混凝土防渗墙关键技术指标选择
10.
Selection of the form construction plan of weir surface concrete of the overflow weir of Ancun Reservoir
安村大坝溢流堰堰面砼模板施工方案选择
11.
Dam block14 and its foundation of the Three Gorges Left-bank Hydropower Station are chosen as a key part for the safety monitoring system.
三峡大坝左厂14号坝段及其基础是三峡大坝安全监测系统选择的关键部位。
12.
Dam Foundation Plane Selection of Lower Dam Site Concrete Gravity Dam in All-Round Management Project of Fengmen Hydropower Station
丰满水电站全面治理工程(重建方案)下坝址混凝土重力坝坝基建基面的选择
13.
The Model of Dam Type Optimum Selection and Its Application Study on Hydro-junction Project;
水利枢纽工程坝型优选模型及其应用研究
14.
Select which types of files to add
选择添加文件的类型
15.
SCIM (Selective Catagories in Microfiche)
选择性缩微胶片类型
16.
APPLICATION OF THE FUZZY OPTIMIZATION MODEL IN DETERMINING THE CONSTRUCTIVE FOUNDATION FACE OF DAMS
模糊优选模型在大坝建基面确定中的应用
17.
The Court found that completion of the dam would violate the Endangered Species Act. Having reached this conclusion, the Court held that it had no choice but to issue an injunction against completion of the dam.
法院认为,修建大坝违背“濒临灭绝物种保护法”,认为只有禁止修建大坝,别无选择。
18.
Selecting a correct way of passing the dam may cut down a lot of expenses for the project and eliminate unnecessary disputes.
选择好的过坝方式,可以节约大量的工程投资及排除不必要的纠纷。