1.
					
							Researches on the No-Wait Permutation Flow Shop Earliness and Tardiness Scheduling Problem
						
						
						无等待排列流水车间提前/延期调度问题
					2.
					
							A Heuristic Algorithm for the Earliness and Tardiness Penalties SchedulingProblem in Permutation Flow Shop
						
						
						排列流水车间提前/延期惩罚调度问题的启发式算法
					3.
					
							Scheduling Two no-wait Hybrid Flowshops;
						
					
					
						
						
					
					
						不允许等待的混合流水两车间排序问题
					4.
					
							Double Machines Flow Workshop Scheduling with Identical Deadline
						
					
					
						
						
					
					
						强制工期相等的双机流水车间排序问题
					5.
					
							Stochastic flow shop scheduling with geometric distributed processing times
						
					
					
						
						
					
					
						加工时间服从几何分布的流水车间随机排序问题
					6.
					
							Chaotic Time Series Analysis of Oil/Water Two Phase Flow Patterns;
						
					
					
						
						
					
					
						油水两相流流型的混沌时间序列分析
					7.
					
							Characteristics of Flow Field in Annulus Space between Train and Tunnel
						
					
					
						
						
					
					
						列车与隧道环隙空间流场特性的研究
					8.
					
							The cast grouping and ordering problem of steelmaking continuous casting hot rolling (SM-CC) is a combinatorial optimization problem.
						
						
						炼钢-连铸生产的浇次组合与排序是带有工艺约束的并行机流水车间调度问题。
					9.
					
							blowdown stream
						
					
					
						
						
					
					
						排出液流,排出水流
					10.
					
							discharge current
						
					
					
						
						
					
					
						排出流排出流泻流排水流
					11.
					
							align the car with the curb; align the sheets of paper on the table.
						
					
					
						
						
					
					
						把汽车排列在路边上。
					12.
					
							The Study on the Multiple Time Scales of Hydrological Time Series in Karst Drainage Basins;
						
						
						喀斯特流域水文时间序列的多时间尺度研究
					13.
					
							Sensitivity Analysis for the Relationship Between  Passenger-Ticket Price and Passenger Volume of Different Sorting Trains;
						
						
						城市间旅客列车的票价与流量的灵敏度分析
					14.
					
							Design of Flow-Shop by Using Genetic Algorithm;
						
					
					
						
						
					
					
						基于遗传算法的流水车间调度的实现
					15.
					
							Research on Rescheduling of Steelmaking and Continuous Casting Hybrid Flowshop
						
					
					
						
						
					
					
						炼钢-连铸混合流水车间重调度研究
					16.
					
							Water supply and drainage system: the water supply and drainage piping from the joint at 1m from the workshop outside wall to water users.
						
						
						供、排水系统:从车间外墙外1米处的接点至用水设备的供水、排水管道。
					17.
					
							Based on high order statistics (HOS) method, a time series model for the spot speeds of successive vehicles on a road section is developed.
						
						
						基于高阶统计量方法 ,建立连续车流地点车速的时间序列分析模型。
					18.
					
							Rank first in the hit charts; rank number one on the hit parade
						
					
					
						
						
					
					
						名列流行音乐排行榜首