1.
					
							Research on Buckling Construction Technology of Five-span Coninuous Girder Steel-tube Concrete Arch Bridge
						
						
						五跨连续梁钢管混凝土拱桥斜拉扣挂法施工技术
					2.
					
							Construction Gist of Tree-span Continuous Steel-pipe Concrete Arch Bridge
						
					
					
						
						
					
					
						三跨连续钢管混凝土拱桥的施工要点
					3.
					
							Analysis on the Main Arch and End Beam of CFST Arch Bridge with Flexible Tied Bar;
						
					
					
						
						
					
					
						“飞燕式”钢管混凝土拱桥主拱与端横梁受力分析
					4.
					
							Study on Aseismic Behavior of Combined Bridge of Continuous Ridig Frame and Concrete-Filled Steel Tubular Arch;
						
						
						连续刚构—钢管混凝土拱组合桥抗震性能的计算研究
					5.
					
							On Stress Performance Experiment & Analysis for Steel Pipe Concrete Beam-arch Combined Bridge
						
						
						钢管混凝土梁拱组合桥受力性能试验和分析
					6.
					
							The Test Study on Connections of Continuous Composite Steel-Concrete Beam Bridges;
						
					
					
						
						
					
					
						连续组合梁桥钢与混凝土连接试验研究
					7.
					
							Design Optimization on Axial Cord of Concrete Filled Steel Tube Arch Bridge;
						
					
					
						
						
					
					
						钢管混凝土拱桥拱肋线形的设计优化
					8.
					
							Analysis of Mechanical Characteristics of Concrete Filled Steel Tubular Arch Bridge with Inverse Bending Arch
						
						
						反拱式钢管混凝土拱桥受力特性分析
					9.
					
							Main arch construction control of the half-through steel pipe concrete arch bridge
						
					
					
						
						
					
					
						中承式钢管混凝土拱桥主拱施工控制
					10.
					
							Stability Research of Concrete-filled-steel Tube Arch Bridge on Filling Concrete for Arch Rib
						
						
						钢管混凝土拱桥拱肋混凝土灌注施工稳定研究
					11.
					
							Research on Prestressing Effects of Prestressed Steel-concrete Composite Continuous Beam Bridge;
						
						
						预应力钢—混凝土组合连续梁桥预加力效应研究
					12.
					
							Research on the Design of Big Span Composite Steel-Concrete Continuous Beam;
						
					
					
						
						
					
					
						大跨径钢—混凝土连续组合梁桥设计研究
					13.
					
							Research on Structure Performance of Steel and Concrete Composite Curved Girder Bridge
						
					
					
						
						
					
					
						曲线钢—混凝土连续结合梁桥结构性能研究
					14.
					
							Design and Construction of Three-span Continuous Steel-concrete Composite Beam of Zengbu Bridge
						
						
						增埗大桥三跨连续钢-混凝土叠合梁设计与施工
					15.
					
							Interaction of steel pipe and concrete in concrete-filled steel tube arch bridge
						
					
					
						
						
					
					
						钢管混凝土拱桥中钢管与混凝土相互作用问题
					16.
					
							Research on the Construction Camber of Prestressed Concrete Continuous Beam of Long Span Bridge;
						
						
						大跨径预应力混凝土连续梁桥施工预拱度控制研究
					17.
					
							Research of the Influence of Large-span Continuous Concrete Bridge Creep on Setting Camber
						
						
						大跨度混凝土连续梁桥徐变对预拱度设置影响研究
					18.
					
							Control of the Shape of Concrete Fill Steel Tube Arch Bridge s Rib While it is Installation;
						
						
						钢管混凝土拱桥拱肋吊装中的拱轴线形控制