说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 预制拼装多用塔机基础
1.
The supervision control of multi-used prefabricated concrete fixed crane base construction
混凝土预制拼装多用塔机基础施工的监理控制
2.
OPTIMIZATION OF THE SHAPE OF PREFABRICATED CONCRETE TOWER CRANE BASE
混凝土预制拼装多用塔机基础底面形状的优化
3.
Discussion on Several Hot Spot Issues for Precast Concrete Consolidated Foundation of Tower Crane
混凝土预制拼装塔机基础几个热点问题探讨
4.
Easily installed, no need basis etc. prefabricate assembly.
压缩机的安装简便,无需基础等预制装配。
5.
MQSeries pre-packages all the machinery needed between a collection of linked applications and the underlying networks.
MQSeries预包装了链接应用程序集合与基础的网络之间所需的所有机制。
6.
Base stability analysis of railway assembled culvert in permafrost region
多年冻土区铁路拼装式涵洞基础稳定性研究
7.
Discussion of Application of Precast Foundations in Fabricated Substations Based on LCC Analysis
引入LCC分析装配式变电站应用预制基础的探讨
8.
The research on method of geometry-control during erection of the short-line bridge
基于几何控制法的短线预制拼装箱梁研究
9.
Application of Precasting and Assembling Techniques to Construction of Shanghai Changjiang River Bridge
预制拼装技术在上海长江大桥中的应用
10.
Comprehensive Application of Construction Techniques for Segmental Precasting and Cantilever Assembling to Bridge Works
节段预制、悬臂拼装工艺在工程中的综合运用
11.
Pre-bias Control of Angle Tower with Main Angle Steel Plug-in Foundation
主角钢插入式基础转角塔的预偏值控制
12.
Researching Manufacture of Newly Prefabricated Box Beam Segment Bridge Erector and Technology of Assembly Quality Control
新型预制箱梁节段架桥机的研制及拼装质量控制技术
13.
Development on Planetary Gear Reducer For Shield Tube Piece Erector
盾构管片拼装机用行星齿轮减速器的研制
14.
Study on the Mechanism of Joint Load-bearing of Various Sections in a Mine Shaft Tower System;
井塔—桩筏基础—地基—井壁的共同作用机理研究
15.
Software for Wind Turbine Tower Foundation Design
用于风电机组塔架地基基础设计的WTF软件
16.
Development and Application of Multimedia Courseware <Computer Electrocircuit Foundation I>;
《计算机电路基础(1)》多媒体课件的制作及应用
17.
The Anticancer Molecule Mechanism and the Basic Experiment Study in Prevention of Hepatocellular Carcinoma with Green Tea Tolyphenols
茶多酚抗癌分子机制及其预防人类肝癌的基础实验研究
18.
Parallel wire strands supported the precast deck every 27ft
使用平行钢丝索来支承预制拼装的桥面结构,钢索间距为27英尺。