1.
					
							Application of slope-layer construction method to the arch dam with rouer compacted concrete of Bailianya Reservoir
						
						
						斜层施工法在白莲崖水库碾压砼拱坝中的应用
					2.
					
							Probe into the Construction Method of Inclined Shaft on Sand and Gravel Aquifer in Surface Soil Section
						
						
						表土段沙砾含水层斜井施工方法探索
					3.
					
							On the construction crafts of the epoxy-coated steel wire strand's stayed cable of some cable-stayed bridge
						
						
						谈某斜拉桥环氧涂层钢绞线斜拉索施工工艺
					4.
					
							Slope Shaft Construction Method by Grouting with Advanced Pipe through Aeolian Sand Seam
						
					
					
						
						
					
					
						采用超前导管注浆法过风积沙层的斜井井筒施工方法
					5.
					
							Construction Control of Long-span Cable-stayed Bridge and Method of Tower and Beam Synchronous Construction
						
						
						大跨度斜拉桥施工控制和塔梁同步施工方法
					6.
					
							Analysis and technological measures for longwall topple mining process at the big inclined angle seam
						
						
						大倾角煤层倾斜长壁仰斜开采工艺分析及技术措施
					7.
					
							Optimization of Cable Tension during the Construction for Cable-stayed Bridges;
						
					
					
						
						
					
					
						斜拉桥施工阶段索力确定的优化方法
					8.
					
							Talking about the Hole-site Correcting Technology in Drilled Pile Construction on Granite Plagioclase Strata
						
						
						花岗岩斜岩地层钻孔桩施工孔位纠偏技术
					9.
					
							Design and Construction of Inclined High-capacity Bunker for Tinpot Coal under High Stress and through Multi-layer in Deep Mine
						
						
						深井穿层大容量倾斜劣质煤煤仓设计与施工
					10.
					
							Three Anti-Measures for Strike Longwall Retreating Mining In Sloping Coal Seam
						
					
					
						
						
					
					
						倾斜煤层走向长壁后退式采煤法的三防措施
					11.
					
							Creep Analysis for Cable Stayed Concrete Bridge during Cantilever-Construction
						
					
					
						
						
					
					
						混凝土斜拉桥用悬臂法施工的徐变分析
					12.
					
							Study on Prediction and Control Method for Construction of Cable-Stayed Bridges
						
					
					
						
						
					
					
						斜拉桥施工过程的预测与控制方法研究
					13.
					
							The Constructive Control of Angle Steel Lean-inserting Foundation and Its Measurement Method
						
						
						斜插角钢式基础的施工控制与检测方法
					14.
					
							Application of Least Square in Concrete Cable-Stayed Bridge Construction Control;
						
					
					
						
						
					
					
						最小二乘法在混凝土斜拉桥施工控制中的应用
					15.
					
							The Research on Construction Control in the Incremental Launching of Main Girder of Cable-stayed Bridge with Steel Box Girder
						
						
						钢箱梁斜拉桥主梁顶推法施工阶段控制研究
					16.
					
							On D temporary beam pivot conversion method in jacking large-span skew frame construction
						
					
					
						
						
					
					
						D型便梁支点转换法顶进大跨度斜交框架施工
					17.
					
							Construction Method and Linear Control of Diagonal Pre-Stressed Box Girder Erection with Guyed Traveler
						
						
						斜交预应力箱梁挂篮施工法及其线形控制
					18.
					
							Study of construction method for the transform floor of the high bnflding structure;
						
					
					
						
						
					
					
						高层建筑结构转换层的施工方法探讨