1.
Application of Pier-beam Support Method in Cast-in-place Box Beam Construction of a Sea-crossing Bridge
墩梁式支架法在某跨海大桥现浇箱梁施工中的应用
2.
Construction Techniques for the Door-type Pier Hat Beam Support Hoisting in Dashangzhuang Extra-large Bridge in Jiaoji PDL
胶济客专大尚庄特大桥门式墩帽梁支架吊装施工技术
3.
The Application of Steel Clip-hoop Stand in Pier’s Cover Beam Construction of Baima River Big Bridge on Shanxi TaiJiu Expressway
钢卡箍式支架在山西太旧高速公路白马河大桥墩台盖梁施工中的应用
4.
On the application of the outside climbing scaffording technique in the high pier construction
浅谈外爬式支架施工技术在高墩施工中的应用
5.
Application of Supportless Supporting with Steel Hoops in the Bent Caps of Bridges
钢抱箍式无支架支撑法在桥梁盖梁中的应用
6.
On Bailey Beam Support System Used in the Construction of Self-anchor Suspension Bridge
用贝雷梁支架系统进行自锚式悬索桥主梁施工
7.
Construction Technique of Great Span Pre-stressed Concrete Continuously Beam Style Support Cast-in-place
大跨度预应力砼连续梁梁式支架现浇施工技术
8.
Application of bridge standing-by structure in top beam's flying falsework
桥梁常备式结构在盖梁悬空支架中的应用
9.
On application of WDJ upside down bowl-type bracket in box girder bridge construction
WDJ碗扣式支架在箱梁桥施工中的应用
10.
Discussion on the stress checking calculation of cast-in-place box beam full framing
浅谈现浇箱梁满堂式支架的受力验算
11.
Hollow box structures for both the deck and piers, whether of steel or concrete, are better than steel trussed structures.
无论是钢结构还是混凝土结构,空心的箱型结构对承梁和桥墩都比钢梁桁架式结构好。
12.
Construction Technology of Concrete Arch Bridge by Long Span Adjustable Steel Arch Frame Without Rest Pier;
大跨度可调式无支墩钢拱架施工混凝土拱桥技术
13.
Analytical study on the 131#~134# pier beams of Shangtang overhead
上塘高架131号~134号墩梁病害分析研究
14.
buttress type power house
支墩式发电厂建筑物
15.
On Application of Portal Supportor Method in Simple Box Girder Construction of Ao River Bridge
门式支架法在鳌江大桥简支箱梁施工中的应用
16.
Supporting frame construction of continuous box girder of Jieyang separated overpass bridge
解杨分离式立交桥连续箱梁支架搭设施工简述
17.
The steel pipe supporting and bamboo slab rubber bottom dieing construction in fish bellied continuous box beam bridge
鱼腹式连续箱梁桥的钢管支架竹胶板底模施工
18.
Construction Technology of Steel Tubular Scaffold with Couplers for Some Box-girder with 40m Length
某40m箱梁扣件式钢管满堂支架施工技术