1.
The tenderer shall seal the book of tender and submit it to the bid invitation unit within the stipulated period.
投标单位应在规定的日期内将投标书密封送达招标单位。
2.
The tenderer does not attend the bid opening meeting.

(五)投标单位未参加开标会议。
3.
Opportunity of Bidders Enterprises in Bid Invitation by Engineering Quantity Bill and the Skill of Quotation;
工程量清单招标中投标单位的机遇与报价技巧
4.
Inquiry into Aggregative Unit Price in Detailed Engineering Quantity List of Bidder;

投标单位工程量清单综合单价问题的探讨
5.
Evaluation Method Based on Artificial Neural Network in Contractor Prequalification of Tenderers;
基于人工神经网络的投标单位资格预审评价法
6.
Analysis of how to prevent and control the imbalanced tender offer of bidding enterprises

浅析如何防范和控制投标单位不平衡报价
7.
Unsuccessful tenderers shall return the bidding documents and relevant materials within7 days upon receipt of notification, and the bid invitation unit shall refund the tenderer the deposit.
未中标的投标单位应在接到通知后7天内退回招标文件及有关资料,招标单位同时退还投标保证金。
8.
Bidding and Claiming of Construction Units with the Pricing Method of Bill of Quantities

论工程量清单模式下施工单位的投标与索赔
9.
Determination of Portfolio Investment Point with Index of Expected Return Per Unit Risk

单位风险收益指标下组合证券投资点的确定
10.
Views on Doing Well Bidding of International Engineering Project for General Contractors;

总承包单位做好国际工程投标的几点思考
11.
The investment controlling and risk management about projects winning a bid which call for bid for the constrution project management unit;
项目管理单位中标项目的投资控制与风险管理
12.
How for the Construction Enterprise to Win the Bid

浅谈施工单位如何适应市场做好投标工作
13.
Article30. The activities of the bid opening, evaluation and selection shall be performed by the bid invitation unit under the auspices of the institutional body for bidding and tendering.
第三十条开标、标、标活动,在招标投标办事机构的监督下,由招标单位主持进行。
14.
Article 30. The activities of the bid opening, evaluation and selection shall be performed by the bid invitation unit under the auspices of the institutional body for bidding and tendering.
第三十条开标、评标、定标活动,在招标投标办事机构的监督下,由招标单位主持进行。
15.
Discussion on the Investment Control of Tenders Invitation Item of Agent Company According to the First Period Project of Road Shuiliuxian;
从水浏线道路一期工程谈代建单位招标项目的投资控制
16.
The Construction of the Performance Evaluation Index System of the Agent of Government Invested Project;
政府投资项目代建单位绩效考评指标体系的构建
17.
Consideration about the Cost Control of the Construction Unit in the Stage of Public Bidding at Present;
对当前建设单位在招投标阶段进行造价控制的思考
18.
Weights and measures units used by the tenderer for his goods should be metric unit unless specific regulations are made in the technical specification.
投标人提供货物所使用的度量衡单位除技术规格中另有规定外,应统一用公制单位。