1.
Property analysis on measured seepage of the right-bank dam foundation at Three Gorges Project
三峡工程右岸坝段实测坝基渗流性态分析
2.
Analysis of Observation Data for Turning Section of Right Part of Danjiangkon Concrete Dam
丹江口混凝土坝右岸转弯坝段观测成果分析
3.
Analysis on the Dam Bypass Seepage on Right-bank in the Dam Site of Songta Hydropower Station
松塔水电站坝址区右岸绕坝渗漏分析
4.
Three Gorges Right Bank First-stage River Diversion Concrete Dam Body Joint Grouting

三峡右岸一期导流工程混凝土坝体接缝灌浆
5.
Studying on the Stability of the High and Steep Rocky Slope at the Right Bank of Anterior Dam in Pubugou Hydraulic Power Station;
瀑布沟坝前右岸岩质高陡边坡稳定性研究
6.
Stability Study on the Right Bank Dam Crest Slope of Dagangshan Hydropower Station in Daduhe River
大渡河大岗山水电站右岸坝顶边坡稳定性研究
7.
Curtain Grouting Test at Underground Powerhouse at Right Bank of Xiangjiaba Dam

向家坝水电站右岸地下厂房帷幕灌浆试验
8.
The safety guarding web design and construction of high slope right bank of Changhe dam power station
长河坝电站右岸高边坡安全防护网设计与施工
9.
Presplit Blasting in Excavation of High Slope at Right Bank of Jinping I Hydropower Station
锦屏一级水电站大坝右岸高边坡预裂爆破施工
10.
Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam
锦屏电站大坝右岸洞室开挖过程控制及对策
11.
Study on Stability of the Right High Slope and Dangerous Rock in the Dam Area of GuWa Hydropower Station;
古瓦水电站坝址区右岸高边坡及两岸危岩体稳定性研究
12.
Experimental Study on Non-Cover-Weight Grouting at Bank-slope Monolith of Goupitan Hydropower Station
构皮滩水电站岸坡坝段无盖重灌浆试验研究
13.
Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;
金沙江向家坝水电站右岸地下电站变顶高尾水系统研究
14.
Stability Evaluation of the Slope above the Top of the Dam on the Right Bank of Jinping I Hydropower
锦屏一级水电站右岸坝顶以上边坡施工期稳定性评价
15.
Study of Foundation Rock Mass Quality Checking on the Right Bank of Jinping I Hydropower Station
锦屏一级水电站大坝右岸建基岩体质量复核研究
16.
Study on curtain grouting scheme and technology for construction of underground powerhouse on right bank of Xiangjiaba Hydropower Station
向家坝水电站右岸地下厂房施工帷幕灌浆方案与技术研究
17.
FEM CALCULATION OF HIGH INLET SLOPE OF DIVERSION TUNNEL ON RIGHT BANK OF CHANGHEBA HYDROPOWER STATION
长河坝水电站右岸导流隧洞进口高边坡稳定性有限元计算分析
18.
Technique of construction of pre-stressed anchor bar for strengthening of high slope on right bank abutment of dam for Xiluodu Hydropower Station
溪洛渡水电站右岸坝肩高边坡预应力锚杆施工技术