1.
Computation of Two-Phase Transient Flow in Li Jia Xia Hydroelectric Power Plant;

李家峡水电站两相非恒定流数值计算
2.
Optimization Analysis of Cooling Water Supply System in Lijiaxia Hydropower Plant

李家峡水电站机组冷却供水系统优化分析
3.
MONITORING RESULT ANALYSIS OF ROCKMASS STABILITY AT THE LEFT ABUTMENT FOR LIJIAXIA HYDROPOWER STATION
李家峡水电站左坝肩岩体稳定监测成果分析
4.
Analysis of Static, Dynamic Calculation of Lijiaxia Arch Dam;

李家峡水电站拱坝静、动力计算分析研究
5.
Analysis & Study on Stability of NO.2 Landslide for Lijiaxia Hydropower Station on Yellow River;
黄河李家峡水电站Ⅱ号滑坡稳定性分析研究
6.
Development and Application of Interfacing Program for Information System on Lijiaxia Hydropower Station
李家峡水电站信息系统接口程序的开发与应用
7.
Method and Principle of Engineering Cost Control in Lijiaxia Hydropower Station Construction Process;
李家峡水电站工程建设中工程造价控制的原则和方法
8.
Quality control in the process of assembling and jointing have interrupted francis turbine at Lijiaxia Hydropower Station
李家峡水电站混流式水轮机分瓣转轮组合与焊接过程中的质量控制
9.
Blasting Vibration Measurement for Dam Abutment of Lijiaxia Hydropower Station

李家峡水站工程坝肩开挖的爆破震动测量
10.
Discussion of the Countermeasure for Management of Supplies in Li Jiaxia Hydroelectric Power Plant;
试论李家峡水力发电厂物资管理的策略
11.
Changes of fishery resources after the construction of cascade hydropower stations from Longyang gorge to Liujia gorge in upper stream of Yellow River
黄河上游龙羊峡至刘家峡河段梯级水电站建设后鱼类资源变化
12.
Sanxia hydro-power will supply electric power to Henan province after completion of construction.
三峡水电站建成后将向河南电网供电。
13.
Mr.LI Yongan Required that the Four Sets of Huge Power Station at Lower Reach of the Jiansha River Shall be Constructed Elaborate Works like Three Gauges Project;
李永安要求金沙江下游四座巨型水电站都要像三峡工程那样建成精品工程
14.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
15.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit

三峡电站700MW水轮发电机组国产化实践
16.
Chinese state media report that the first turbine generator on the right bank of China's Three Gorges Dam has begun sending electricity to the state power grid.
中国官方媒体报导说,中国三峡大坝右岸电站首台水轮发电机组开始向国家电网输送电力。
17.
The Studies on the Operation Management of the Sanmenxia Hydropower Station;

三门峡水电站运营管理若干问题研究
18.
Design of Haidianxia Hydropower Plant Computer Monitoring System and Vibration-Throw Monitoring;
海甸峡水电站计算机监控及振摆监测