1.
					
							A consolidating technology of pouring starch into bottom board to cut off water in coal pitJiaozuo coal industry group Fang-Zhuang coal mine;
						
						
						井下煤层隔水底板注浆堵水加固技术
					2.
					
							The distance from the impermeable base to the free surface is a function of space and time.
						
						
						由隔水底板至自由面的距离是空间和时间的函数。
					3.
					
							ABSTRACT: This paper provides formula of critical production computation of oil wells in reservoir with bottom water and confing bed, which is suitable for all wells in reservoirs with bottom water and confing bed.
						
						
						本文给出了带隔板底水油藏油井的临界产量计算公式,它适用于所有带隔板底水油藏的油井。
					4.
					
							Analysis on permeability of key water isolated stratum under seam floor and under stress function
						
						
						应力作用下煤层底板关键隔水层渗透性分析
					5.
					
							RELATIVE STRATA IMPERMEABILITY IN ORDOVICIAN TOP AND RISK ASSESSMENT OF WATER INRUSH FROM COAL FLOOR IN XINYI COALFIELD
						
						
						新驿煤田奥灰顶部相对隔水性及底板突水危险性评价
					6.
					
							EXPERIMENTAL RESEARCH ON FRACTURE EVOLUTION LAW OF WATER-RESISTING STRATA IN COAL SEAM FLOOR ABOVE AQUIFER
						
						
						承压水上开采煤层底板隔水层裂隙演化规律的试验研究
					7.
					
							Therefore, the barrier distribution should be taken into consideration for the perforation of reservoir with bottom water and gas cap.
						
						
						因此,气顶底水油藏油井射孔时,应考虑隔板的分布。
					8.
					
							bilge board
						
					
					
						
						
					
					
						(船底)活水道盖板
					9.
					
							The problem of no water cut of oil well production for a long time in bottom water reservoir with barrieris is solved.
						
						
						并结合实例进行了计算,从而解决了带隔板底水油藏油井长期生产而不见水的问题。
					10.
					
							Study on the Dynamic Monitoring System of the Destroy of the Bed Plate and the Water of the Bed Plate;
						
						
						采场底板破坏及底板水动态监测系统研究
					11.
					
							The grouting reconstruction technique of lower confining bed can be used to control the water hazard from coal floor.
						
						
						煤层底板含水层注浆改造技术可以彻底根治底板水害。
					12.
					
							Influence of the impervious interbeds on the drainage and oil production performance of the thin oil reservoir with bottom water
						
						
						隔夹层对薄层底水油藏排水采油动态影响研究
					13.
					
							Technical specification for construction of light partition wall with GRC strip plates
						
					
					
						
						
					
					
						增强水泥条板轻隔墙施工技术规程
					14.
					
							bilge board scow
						
					
					
						
						
					
					
						一种装有舷侧披水板的平底浅水赛艇
					15.
					
							Study on the Floor Water Invasion Regularity Mining on the Top of Water-pressured;
						
					
					
						
						
					
					
						承压水体上开采底板突水规律的研究
					16.
					
							A floating barrier separates a clean water surface from a water surface containing the monolayer.
						
						
						一块浮动隔板将清洁的水面与含单分子层的水表面隔开。
					17.
					
							Influence of Dredging on Suzhou Creek Ecology System
						
					
					
						
						
					
					
						苏州河底泥疏浚对围隔中水生生态系统的影响
					18.
					
							Base cabinets are reinforced with internal reinforcing front and rear posts and will have shelf-clip adjustment holes.
						
						
						底柜前部和后部支撑有加强筋,筋上有隔板调节孔。