1.
Exploration on Ring-section Construction Methodology about Concrete Rigid Frame Arch Bridge under Full Stents Conditions
砼刚架拱桥在满堂支架条件下分环分段施工方法的探讨
2.
Environmental Effect Analysis of NO.112 Highway (Tianjin District) during Construction Period;
国道112线天津东段施工期环境影响分析
3.
Analysis by Field Measurement on a Cut and Cover Railway Tunnel Excavation near Meilan Airfield in Hainan
海南东环铁路美兰机场明挖隧道试验段施工监测与分析
4.
Analysis and Control for Engineering Cost in Highway Construction Stage;

公路施工阶段工程费用的分析与控制
5.
sectionalizing a line for inspection, maintenance or construction purposes;

将线路分段以进行检查、维修或施工;
6.
The Construction New Technology Researching and Theory Analyzing of Tunnel s Gate;

隧道洞口段施工技术研究和原理分析
7.
Load Reaction Analysis of the Girder of YongAn Bridge During Construction Procedure;

抚顺永安桥施工阶段主梁的受力分析
8.
Analysis of Causes of Cracks in Concrete Construction Process

施工阶段混凝土裂缝原因分析及控制
9.
Analysis and Control on Cost of Quality of Consturction Stage in Construction Engineering;
建筑工程施工阶段质量成本的分析与控制
10.
Risk Analysis and Management During the Bidding Phase of Electric Power Projects;

电力工程施工招投标阶段的风险分析和管理
11.
An Identification Model with Hierarchy Analysis for Investment Risks in the Phase of Project Construction;
工程项目施工阶段投资风险层次分析辨识模型
12.
Construction Method of Subsection Installing for 120 Ton Converter Installation

一钢轧总厂120 t转炉炉体分段安装施工工艺
13.
Analysis on Soil Properties and Environment Effects Induced by Pipe Jacking;

顶管施工中土体性状及环境效应分析
14.
Construction of the Environmental Impact Analysis and Evaluation of Research;

建筑施工的环境影响分析及评价研究
15.
Mechanism Analysis on Environmental Problems Caused by CFG Pile Construction and the Countermeasures
CFG桩施工产生环境问题的机理分析及应对措施
16.
Analysis on Affecting Factors of Project Cost in Construction Phase and Control Measures

建筑项目施工阶段工程造价影响因素分析与控制措施探讨
17.
Investment Control and Investment Deviation Analysis by the Client during Construction Stage
业主在施工阶段的投资控制及偏差分析
18.
Study on Rock Mass Sub-Classification in Construction Stage for Road Tunnel;

公路隧道施工阶段岩体围岩亚级分级研究