1.
Technical Analysis of AP1000 nuclear island of third-generation nuclear power technology
第3代核电技术AP1000核岛技术分析
2.
Design rules for mechanical components of pwr nuclear islemds
GB/T16702-1996压水堆核电厂核岛机械设备设计规范
3.
Construction Technology of Safety Shell Prestress in Ling'ao Nuclear Power Station Phase Ⅱ
岭澳核电站二期核岛安全壳预应力施工技术
4.
STUDY OF SAFETY CONTROL OF FOUNDATION PIT EXCAVATION BY BLASTING IN NINGDE NUCLEAR POWER PLANT
宁德核电站核岛基坑爆破开挖安全控制研究
5.
Recently How To Choice Organization Management Mode Of Nuclear Power Nuclear Island Large Repair
近期核电站核岛大修组织管理模式的选择
6.
Study on Nuclear Island Design and Procurement Schedule under EPC Contract;
EPC合同模式下核岛设计采购进度研究
7.
Main steam safety valve is the protective device against overpressure in the steam system of nuclear island.
主蒸汽安全阀是压水堆核电站核岛内主蒸汽系统的超压保护装置。
8.
Study on Stability for the Pumping Station Pit of the Nuclear Island in Hongyanhe Nuclear Power Plant;
辽宁红沿河核电厂一期工程核岛泵房基坑稳定性研究
9.
STUDY ON LOCALIZATION OF MANUFACTURE OF UNDERRELAXATION PRESTRESSED STEEL SHANDS FOR CONTAINMENT OF Ling'ao NUCLEAR POWER PLANT (PHASE-Ⅱ) AND ITS USE
岭澳核电二期核岛安全壳低松弛预应力钢绞线国产化研究及应用
10.
The main factor of localization of nuclear island major equipment of PWR nuclear power plant--Large forgings
压水堆核电厂核岛主设备国产化关注点——大型锻件
11.
Defusing the Nuclear Crisis and Moving the Korean Peninsula away from the Cold War;
朝鲜半岛核危机的化解与半岛走出冷战
12.
The TMI nuclear facility has two reactors.
三哩岛核设施有两个反应堆。
13.
The TMI plant was duly constructed.
三哩岛核电厂按时批准兴建。
14.
Declaration on Non-nuclear Korean Peninsula Peace Initiative
无核朝鲜半岛和平倡议声明
15.
Study on Landscape Planning for the Core Area of Long Wan s Seaside in Hu Lu Dao;
葫芦岛龙湾海滨核心区景观规划研究
16.
Improvement Research for the Performance Appraisal System of Qingdao GM Company
青岛GM公司绩效考核体系改进研究
17.
Progress of Studies on Nuclei around "Island of Inversion"
反转岛附近原子核奇特性质研究进展
18.
Choice on Chinese Policy to Korean Peninsula in Post North-Korea's Nuclear Weapon Time
后朝核时代中国的朝鲜半岛政策选择