说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 萨扬-舒申斯克水电站
1)  Sayano-Shushenskaya GES
萨扬-舒申斯克水电站
2)  Kangyang hydropower station
康扬水电站
1.
Design of stilling basin for spillway gate of Kangyang hydropower station on the Yellow River;
黄河康扬水电站泄洪闸消力池设计
2.
The left bank and riverbed water retaining dam of Kangyang hydropower station is a dam with inclined loam core.
康扬水电站左岸及河床挡水坝为壤土斜墙坝。
3.
Taking the construction of Kangyang Hydropower Station as an actual case,the genesis of concrete cracking is summarized and analyzed herein,and the cracks are treated with the chemical grouting measure concerned.
以康扬水电站为例,针对裂缝成因进行了综述和分析,采用化学灌浆法进行裂缝处理。
3)  Sacksen-Werke type compensated motor
萨克申-沃克补偿电动机
4)  Schuktsen
舒克申
1.
A Literary "Genius" from the Black Soil: On the Short Stories by the Contemporary Russian Writer Schuktsen;
从黑土地上走出的文坛奇才——俄罗斯当代作家舒克申的短篇小说解读
5)  pumping-up power station
扬水式发电站
6)  lexus
雷克萨斯
1.
Engine Fault Analysis on TOYOTA LEXUS LS400;
丰田雷克萨斯LS400型轿车发动机故障分析
补充资料:萨扬-舒申斯克水电站
      苏联最大的水电站。建于西伯利亚的叶尼塞河上。采用单机容量为64万千瓦的大机组,装机总容量640万千瓦,年发电量235亿度。
  
  萨扬-舒申斯克水电站于1968年9月动工,1987年建成,历经20年。其间曾采用临时进水口和临时水轮机转轮,在低水头60米(相当于设计水头194米的32%)下提前发电,取得了较好的经济效益,是苏联水电站建设中的一项重要经验。
  
  叶尼塞河上游地区年平均气温为 1.5℃,最低气温-42℃,坝区冬季施工条件较差。电站坝址处河水的平均年径流量为467亿立方米,平均流量1480米3/秒。水库总库容313亿立方米。水库消落水深40米,相应有效库容为153亿立方米。大坝高242米,是世界上迄今已建重力拱坝中最高的。大坝顶长1083米,坝基宽100米,迎水面为垂直状,平面呈弧形,半径为600米。溢流孔11个,设计泄水量13600米3/秒。电站厂房在大坝下游,也呈弧形,连安装间共长288米。
  
  电站选用混流式水轮机,转轮直径6.77米,额定转速142.8转/分。设计水头194米,过流能力358米3/秒,额定出力65万千瓦。在最大水头212米时,出力可达73.5万千瓦。转轮重156吨,整体水运。发电机额定出力71.5万千伏安,最大出力73.6万千伏安。转子采用强制式风冷,定子采用水内冷。
  
  变压器采用扩大单元结线,每两台发电机与一组容量为160万千伏安的单相升压变压器相联。每台单相变压器为53.3万千伏安。电站生产的电能经变压器升压至500千伏,经超高压输电线联入西伯利亚联合电力系统。
  